10.85M Aluminum Fish/Dive Charter Catamaran

Week 9 has now passed and the major fabrication and welding work is finished. The engines have not yet arrived so we have installed the aft topsides and started the long list of small jobs to be completed.

alloy catamaran
Side plating completed
Bow view
Stairs to flybridge
Aluminum catamaran fabrication
Side trim and engine air intake
Flybridge side
Down to forward cabin
Side trim, deck with cleat