Aluminum Catamarans Progress Week 8

By | Catamarans

Two of the catamarans are now ready for fit-out with the third vessel currently being plated. The Dive and Excursion Cats are completely welded inside with a few small sections of the exterior to be completed next week. These two boats will now have electrical and systems installation started and we will fit a set of engines to the Dive Cat for in-water testing.

aluminum boats

Aluminum catamaran – Dive version

aluminum catamarans for diving

Dive Cat tunnel view

DSCN8155

Excursion Cat side view

Tour catamaran

Excursion Cat aft view

Alloy Catamarans Progress

By | Catamarans

We’re now fabricating the cabin for the Dive Cat and plating the hull of the Excursion Cat. There have been some problems to work through but progress is still good.

aluminum power cat

Catamaran side view

side view aft

tunnel view

Aluminum catamarans progress Week 4

By | Catamarans

The first catamaran is now well fabricated and full welding of plate interior has started. We leave the side plates off until the keel, bottom plates and chine have been fully welded inside. Boats #2 and #3 are currently having frames set up with fabrication planned to start next week.
building catamarans in Thailand
power catamaran
The deck has been laid and weld slots cut for the center section above tunnel.
deck weld slots
The design is fitted with many small strengthening brackets as can be seen in the photo below.
welding aluminum boat
Below is a view of some of the interior welding.
welding aluminum

Aluminum Catamaran Progress Week 3

By | Catamarans

Fabrication work for the Dive version of our 10.85M aluminum catamaran is now around 70% complete and full welding has started. Main deck is partially laid and tacked in place and tunnel plate has been fitted and also tacked.

ALLOY CATAMARAN BUILD

Tunnel view with forward plate tacked in place

The main deck is laid and tacked so as it acts as a stiffener during full welding of hull plate and frames.

Thailand aluminum boat builder

View of aft deck and stiffeners

aluminum boats

Our current price for this aluminum catamaran set-up for diving is 7 million Thai Baht, for orders of more than one unit we can offer a discount.

10.85M Aluminum Catamarans Construction

By | Catamarans

Keels are laid for all three boats and construction of the first is moving at a good pace. Most of the hull fabrication is complete and full welding has started.  The bow view below gives an idea of the strength being built in to these boats.alloy catamaranHere is a view through the tunnel showing  main hull frames and wave breaker.power catamaransThese three boats will be powered with twin 250HP Yamaha 4-stroke outboards and one vessel will be used for diving, the second as a Ferry and the third will be an open Excursion vessel.building an aluminum catamaran

Buddhist Keel Laying Ceremony for 3 Aluminum Catamarans

By | Catamarans

Construction of the three aluminum catamarans is now officially underway following a traditional Buddhist keel laying ceremony at our Sattahip factory last Sunday. aluminum catamaran keel laid
The ceremony aims to help make construction proceed as smoothly as possible and is taken very seriously by the Thai staff. ‘Sabai Jai’ or ‘good feeling in the heart’ is assured for everyone involved when the ceremony is performed properly. aluminum boat builder
Fire crackers are lit and go off with extreme noise to frighten away any bad spirits which may be hanging around.boat keel laying ceremony
Our ceremony was performed by a knowledgeable Buddist lay practitioner. A lay practitioner is simply one who has not been fully ordained as a monk or nun. Generally Buddist tradition views the lay person as fully capable to become enlightened. Buddhist boat blessing

10.85M Aluminum Catamaran Progress

By | Catamarans

Keels are now being laid for the three boats being constructed for export. We are using high quality pulse MIG welding machines imported from Japan.
aluminum boat builder
The welding machines will produce output current to 400 amps but this amount of current is rarely required.
alloy catamaran
We expect to have all three sets of keels laid by the end of Saturday ready for a Bhuddist blessing ceremony on Sunday.
catamaran Thailand

Building the New Factory

By | Catamarans

In order to be able to build three or four of the 10.85M aluminum catamarans at the same time we are constructing a new 440 square meter shed. The shed was started 3 weeks ago with the earthworks and at the end of today has concrete laid, the support beams up and roof trusses installed. aluminum boat builder

Roofing will be installed next week just as the aluminum for building three 10.85M catamarans arrives.

aluminum catamaran builder