At the end of week #8 and the cabin exterior, fly bridge and cabin bulkheads have been installed. Interior stairs down to the forward cabin and cabin floor plates are fitted. Almost all interior welding has been completed.
At the end of week #8 and the cabin exterior, fly bridge and cabin bulkheads have been installed. Interior stairs down to the forward cabin and cabin floor plates are fitted. Almost all interior welding has been completed.