Week 8 of 10.85 meter Sports Catamaran Build

By December 9, 2016Catamarans

At the end of week #8 and the cabin exterior, fly bridge and cabin bulkheads have been installed. Interior stairs down to the forward cabin and cabin floor plates are fitted. Almost all interior welding has been completed.aluminum catamaran new build

week7-003

week7-009