Week 9 has now passed and the major fabrication and welding work is finished. The engines have not yet arrived so we have installed the aft topsides and started the long list of small jobs to be completed.
Week 9 has now passed and the major fabrication and welding work is finished. The engines have not yet arrived so we have installed the aft topsides and started the long list of small jobs to be completed.